top of page
diamond-plate-metal-background-brushed-metallic-texture-3d-rendering.jpg

Run the Numbers For Yourself

Use our front-load route conversion tool to compare traditional routing, full conversion, retrofits, and Johnny Jaws using real operational inputs.

Step 1: Your Operation

Use ballpark numbers from a normal day on the route. This isn’t meant to be exact, it’s just a practical way to compare your options side by side.

Average dumpster size:

missing fields

Step 2: Compare YOur Options

Here's a side-by-side look based on the numbers you entered.

The Status Quo

Option 1: No change. Keep current rear-load routing as is.

Conversion Cost:

$0

Containers changed:

None

Operational Disruption:

Low

Note:

Productivity stays fixed while costs tend to rise over time.

Total Front-Load Conversion

Option 2: Replace rear-load containers with front-load containers.

Conversion Cost:

$--

Containers changed:

Replace All

Operational Disruption:

High

Note:

Highest upfront conversion cost, requires new containers and route changeover.

Fork Pocket Retrofit

Option 3: Modify eligible rear-load containers with fork pockets.

Conversion Cost:

$--

Containers changed:

Modify Some

Operational Disruption:

Medium

Note:

Only applies to 1–2 yard metal rear-load dumpsters, larger cans still require replacement.

Only applies to 1–2 yard metal rear-load dumpsters, larger cans still require replacement.

Johnny Jaws

Option 4: Front-load flexibility without converting or modifying containers.

Conversion Cost:

$24,900

Containers changed:

None

Operational Disruption:

Low

Note:

Services metal rear-load dumpsters up to 4 yards on the same route.

Favicon - Johnny Jaws.png

Notes About this Comparison

This comparison uses the same basic assumptions across all four options and scales them using the numbers you entered.

The biggest differences come from conversion costs, container changes, and how much disruption each option introduces to your routes.

These numbers are meant to show relative differences between options, not exact budgets.

Step 3: Get A DEtailed Quote Tailored to your Operation

Share a few details and we'll reach out to see how your numbers did, answer any questions and provide a detailed quote.

Fleet Size
  • This comparison uses a small set of consistent assumptions across all options so the differences are easier to see.

    Service time per container
    Rear-load routes are estimated at about 5 minutes per container, based on the typical 4–7 minute range. Johnny Jaws–equipped front-load trucks are estimated at 50 seconds per container.

    Route time
    Total route time is calculated by multiplying the number of containers per route by the estimated service time.

    Operational value
    Your daily operating cost is used to estimate a rough cost per productive hour. Time saved per route is multiplied by routes per day and operating days per year to show a directional annual operational impact.

    Conversion costs
    Full front-load conversion includes estimated container replacement and shipping only. Truck cost is excluded since it applies to all front-load options.


    Fork pocket retrofits are estimated per container and apply only to 1–2 yard metal dumpsters.


    Johnny Jaws uses the published installed price and does not require container modification.

    These estimates are intended to show relative differences between options, not exact budgets. Actual results will vary based on route layout, access, container mix, labor structure, and region. For a more in-depth explanation, read our full White Paper and reach out with any questions.

SWANA logo.jpg
WHSLOGO.jpg
WASTE EXPO LOGO.png
bottom of page